Home Glossary Greenfield City
Glossary

Greenfield City

In one line

A city built from scratch on undeveloped land rather than expanding an existing one; Dholera is a flagship greenfield project.

A greenfield city is one built from scratch on previously undeveloped land, as opposed to a brownfield project that redevelops or extends an existing urban area. Building on a clean slate allows planners to lay down roads, utilities and zoning to a modern master plan without inheriting old constraints.

Dholera is a flagship greenfield smart-city project. It is being developed on flat, low-lying coastal Bhal land formed from 22 villages of Dholera taluka, with a phased build-out planned over roughly 30 years across a planning envelope of about 920 sq km. This greenfield character is why the region can be designed around integrated utilities and a command centre from day one.

For a buyer, greenfield status cuts both ways. It supports the promise of planned, modern infrastructure and a lower early entry point, but it also means a longer horizon and early-stage risk, since much of the land is still being developed in phases. It is worth remembering that GIFT City, not Dholera, is described as India's first operational greenfield smart city. Read What is Dholera SIR, understand the staging in Dholera Phases and Timeline, and compare in Dholera vs GIFT City.