Home TP Zones Dholera TP4: mixed-use land tied to the solar park and public infrastructure
Town Planning Zone

Dholera TP4: mixed-use land tied to the solar park and public infrastructure

Updated 22 July 20268 min readSourced and dated
The short answer

TP Scheme 4 (TP4) is the second Dholera scheme where the exact area is not reliably sourced, and we refuse to invent one. Portal commentary describes TP4 as mixed-use land tied to the solar park and public infrastructure, but that is commentary, not official zoning. The one solar anchor that is firmly documented, the Tata Power 300 MW plant online since April 2022, is a real, confirmed asset in the region, even though the far larger 5 GW target is not installed. Like all six Dholera schemes, TP4's draft is reported sanctioned. As with TP3, the thin scheme-level data means a buyer should lean hard on parcel-level checks: Final Plot number, sanctioned plan, title chain and RERA status.

TP4 is the companion case to TP3: a scheme with a described flavour but without a reliably sourced area. We treat it the same way, by telling you clearly what is documented, refusing to fabricate the parts that are not, and steering you toward the checks that outrank any zone label. The difference with TP4 is its association with Dholera's solar story, which is one of the few parts of the region with a genuinely operational anchor to point at.

As with every scheme, the anchor page on what a TP scheme is is the foundation. Read it first, because the Final Plot logic there is what protects you when the scheme-level numbers are thin, as they are here.

The honest gap: TP4's area is not reliably sourced

TP4, like TP3, does not have an area figure we are willing to publish. The schemes with reported areas are TP1 at roughly 51 sq km, TP2 at roughly 102, TP5 at roughly 75 and TP6 at roughly 67. TP4 is not among them. Its area sits inside DSIRDA's Final Development Plan documents in a form we do not have, and we will not substitute a broker estimate for it. If the number matters to your decision, obtain it from the sanctioned scheme plan through DSIRDA. This is the same standard we hold for TP3, and it is deliberate.

We will not invent a number: TP4's exact area is not reliably sourced. A site that prints a precise square-kilometre figure for TP4 should be able to cite a DSIRDA document. For a real decision, take the area from the sanctioned scheme plan, not from a listing or a portal summary.

The 'mixed-use, solar and public infrastructure' character

Portal commentary describes TP4 as mixed-use land linked to the solar park and public infrastructure. The mixed-use label suggests a blend of residential, commercial and support uses rather than a single dominant function, and the solar and public-infra association ties the scheme narratively to Dholera's renewable-energy footprint and its civic backbone. We present all of this as portal-sourced commentary, not as an official land-use designation, because the binding zoning percentages for Dholera are not reliably sourced. Treat the character as a directional hint, not a guarantee about any parcel.

The solar anchor: what is real and what is only a target

Because TP4 is associated with the solar story, it is worth being precise about that story, since it is one of Dholera's few operational anchors. The confirmed fact is the Tata Power Renewables 300 MW plant, online since April 2022, built on 1,320 acres with over 870,000 monocrystalline modules. That is real and running. The much-quoted 5,000 MW, or 5 GW, figure is the ultimate target for the wider Dholera solar park, not installed capacity, and reported commissioned totals beyond the 300 MW plant are not cleanly reconciled across sources, so we use them cautiously. Read the full breakdown on our Dholera solar park page.

The lesson for a TP4 buyer is to keep the operational 300 MW plant separate from the aspirational 5 GW headline. The solar association is a genuine feature of the region, but it does not translate into any specific value for a plot, and it certainly does not justify a price built on the full 5 GW being live, which it is not.

AttributeTP4Confidence
Scheme areaNot reliably sourcedUnknown
Character labelMixed-use, solar + public infraPortal commentary
Scheme sanctionDraft sanctionedReported
Land-use percentagesNot reliably sourcedUnknown
Tata Power 300 MW solarOnline since April 2022Confirmed
5 GW solar parkUltimate target, not installedTarget
For TP4, only the sanction status (reported) and the 300 MW solar plant (confirmed) are firm. Area and land use are not reliably sourced; the character is portal commentary; the 5 GW figure is a target.

What a buyer should do in TP4

The playbook mirrors TP3. With scheme-level data thin, the parcel-level checks carry the weight. Confirm the Final Plot number and sanctioned TP proof for the exact plot. Verify title through the sale deed, the 7/12 extract and a 30-year encumbrance search. Confirm RERA registration by number on the Gujarat portal if the project is being marketed, and reject any claim that SIR status removes the RERA or N.A. requirement. Where a listing leans on the solar or public-infrastructure story, separate the confirmed 300 MW plant from the aspirational 5 GW target. Our verification guide and N.A. conversion page are the references.

The bottom line on TP4: a mixed-use scheme narratively tied to solar and public infrastructure, with a real operational solar anchor nearby but without a reliably sourced area or land-use split. Take the character as commentary, take the area from DSIRDA, keep the 5 GW target in its box, and let the Final Plot number decide whether any given plot is genuine.

Frequently asked questions

How big is Dholera TP4?
TP4's exact area is not reliably sourced, and we will not publish a figure we cannot stand behind. Unlike TP1, TP2, TP5 and TP6, whose areas are reported, TP4's area sits inside DSIRDA's Final Development Plan documents in a form we do not have. Obtain it from the sanctioned scheme plan through DSIRDA if you need it.
What is TP4 used for?
Portal commentary describes TP4 as mixed-use land tied to the solar park and public infrastructure. That is commentary, not official zoning. The binding land-use percentages are not reliably sourced, so confirm the sanctioned use for any specific parcel rather than trusting the zone label.
Is the Dholera solar park in TP4?
TP4 is described in portal commentary as associated with the solar park. The firmly documented solar anchor is the Tata Power 300 MW plant, online since April 2022. The wider 5,000 MW target is not installed. Keep the operational plant separate from the aspirational target when weighing TP4.
Is the 5 GW solar capacity real?
The 5,000 MW, or 5 GW, figure is the ultimate target for the Dholera solar park, not installed capacity. Only the 300 MW Tata Power plant is confirmed operational. Reported commissioned totals beyond that are not cleanly reconciled across sources, so treat the 5 GW headline as a target.
Is TP4 sanctioned?
TP4's draft scheme is reported to be sanctioned, as are all six Dholera schemes. We use the reported label because the sanction status comes from planning and press sources rather than a single primary certificate. Verify the current status before acting.
What should I check before buying in TP4?
Confirm the Final Plot number and sanctioned TP proof, verify title through the sale deed, 7/12 extract and a 30-year encumbrance search, and confirm RERA registration by number on the Gujarat portal. Because TP4's scheme-level data is thin, these parcel-level checks matter more, not less.

Sources

  • Dholera property portals and summaries (TP4 mixed-use, solar and public-infrastructure character, portal commentary).
  • Tata Power, 2022 (300 MW Dholera plant online since April 2022, confirmed; 5 GW is a target).
  • sir-dholera fact base, July 2026 (all six schemes sanctioned reported; TP3/TP4 areas not reliably sourced). See our full sources page.