Is the Tata semiconductor plant operational?

Updated 22 July 20266 min readSourced and dated
The short answer

No. The Tata Electronics and PSMC semiconductor fab in Dholera is under construction, not operational. Civil work was reported around 50 percent complete in April 2026, moving toward cleanroom and equipment installation. Trial chip production is targeted for December 2026, and no source confirms a chip has been produced yet. It is a confirmed Rs 91,000 crore project, but it is not yet making chips.

The plant is real and funded, but it is not yet running. This is one of the most confused points in Dholera coverage, partly because the project is genuinely large and partly because a dead, unrelated deal keeps polluting search results. So let us separate what is confirmed, what is targeted, and what is stale.

What is confirmed

The fab is a Tata Electronics and PSMC venture, approved by the Union Cabinet on 29 February 2024 under the India Semiconductor Mission, run through Tata Semiconductor Manufacturing Pvt Ltd. The investment is Rs 91,000 crore, roughly US$11 billion, with the Fiscal Support Agreement signed on 5 March 2025 and the mission covering 50 percent of eligible cost. Planned capacity is up to 50,000 wafers a month on 300mm wafers, using PSMC technology with a debut 28nm node. In May 2026, Tata announced an ASML partnership to deploy lithography tools at the fab. All of that is confirmed.

Rs 91,000 cr
investment (confirmed)
~50%
civil work, April 2026
50,000
wafers/month capacity (target)
Dec 2026
trial production target

What is still a target

The parts that would make it operational are targets. Civil construction was reported around 50 percent complete in April 2026, moving into cleanroom and equipment integration. First-chip trial production is targeted for December 2026, per the minister, and no source confirms a chip produced yet. The greater-than-20,000 jobs figure, and the multi-fab vision of around 100,000, are also targets. So the honest status is: physically rising, not yet producing.

Trial is not full production. Even if the December 2026 trial target is hit, trial output is not the same as commercial-scale manufacturing. Read any December 2026 milestone as the start of testing, not a fully operational fab churning out chips at capacity.
Ignore the Vedanta-Foxconn line. Any search result claiming a live Vedanta-Foxconn Rs 1.54 lakh crore Dholera fab is stale. That MoU dates to September 2022, was never built, and Foxconn withdrew in July 2023. It is not a current Dholera project. The live fab is the Tata-PSMC one.

Why the fab matters even before it opens

A Rs 91,000 crore facility under construction is already the anchor that gives the rest of Dholera its demand case. Read the full fab project page for the detail. It is the reason the airport needs air freight, the reason the expressway and rail matter, and the reason the wider jobs and industry plan looks at Dholera at all. But for anyone timing an investment, under construction and operational are very different states, and the fab is firmly in the first.

Frequently asked questions

Is the Tata chip plant in Dholera making chips yet?
No. As of 2026 it is under construction, with civil work reported around 50 percent complete in April 2026. Trial chip production is targeted for December 2026, and no source confirms a chip produced yet.
How much is Tata investing in the Dholera fab?
Rs 91,000 crore, roughly US$11 billion, confirmed under the India Semiconductor Mission, with the government covering 50 percent of eligible cost and the Fiscal Support Agreement signed in March 2025.
When will the Tata fab start production?
Trial production is targeted for December 2026. That is a target, and trial output is not the same as full commercial-scale manufacturing, which would come later.
What about the Vedanta-Foxconn Dholera plant?
That deal is dead. The September 2022 MoU was never built and Foxconn withdrew in July 2023. Any current claim about a live Vedanta-Foxconn Dholera fab is stale and should be ignored. The active project is Tata-PSMC.

Sources

  • PIB (India Semiconductor Mission approval; Fiscal Support Agreement Rs 91,526 crore).
  • Tata Electronics (PSMC technology, ASML partnership announced May 2026).
  • Press reports, April 2026 (~50% civil progress); Minister Vaishnaw (December 2026 trial target). See our sources page.